Page 5 of 6

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-04 04:22pm
by Lascaris
Britain Q4 1926

Industrial base: 520
Economy bonus:52
Total: 572

Infrastracture:
100 IBP to increase of industrial capacity (complete January 1927)
Upgrade 3 25-40kT Slips to 70kt slips: 60 (complete January 1927)
Create 1 70kt slip: 25 (complete April 1927)
Research Air Tech: 15 (149.95 total invested)
Research Army Tech: 5 (0 total invested)

Navy: Total 367

2 Leopard class BC: 97 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete July 1927)
2 Hibernia class BB (55kt): 110 (construction complete January 1928)
24 Porpoise class submarines: 21.6 (construction complete January 1927)
8 Hurricane class DD leaders leaders: 14 (construction complete January 1927)
16 Porpoise class submarines: 14.4 (construction complete April 1927)

Completed

None

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-07 09:59pm
by Fingolfin_Noldor
1926Q3

Note: additional 22 IBPs for this year

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (120 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 285 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 52 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 26 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points

Total points: 208 points

***: 1 for the Balkan Confederacy

Total: 571 points (about)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 57.6 points
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession ~ 5 years (Start Q3 1926)
Project Eagle ~ 4 years (Start Q3 1926)
Project StarStruck ~ 2 years (Star Q3 1926)

Surplus left : 276.4 points (Aid to be repaid later.)

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-10 09:50am
by loomer
Q3 1926
360 points available (200 base + 150 war time + 10 from industrial investment prior year)

Prior Investments:
2 new Fighter-Carrier Zepellins: 10 Points

350 points free, 4/12 quarters of Wartime production so far.
Logistical Support for Coastal Push: 10 points

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 250 points)
Tank manufactory program: 35 points (total now 70 + 10)
Continuing wartime production investments: 20 points
National Railroad Project: 50 points
Air Force Modernization Program (to AFT:3): 60 points
Fort Modernization Program: 50 points

New Units:
150 new fighters, 1917 grade: 15
100 new heavy bombers, 1917 grade: 50

Research: Project Manpower (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)

Q4 1926
360 points available (200 base + 150 war time + 10 from industrial investment prior year)


5/12 quarters of Wartime production so far.
Logistical Support for Coastal Push: 20 points
De-Mobilization Support: 60 points (to continue full force mob until Q2 1927, with steady recalls to staging areas and then back to civilian centres of origin.)

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 250 points)
Tank manufactory program: 40 points (total now 110 + 10)
Continuing wartime production investments: 20 points
National Railroad Project: 50 points
Air Force Modernization Program (to AFT:3): 60 points
Fort Modernization Program: 50 points

Research: Project Manpower (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-12 01:30pm
by Raesene
Tuscan Kingdom, Q4 1926:

Infrastructure: 20 General improvements to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and abroad
total 40pts; same amount spent since game start

Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance

towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start

Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 3/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Nonmetalli e Semimetalli | 3 | 36 quarter 3/4 | repeat Alkalini DDs; under construction

BB |1x Patria |50 | 50 |Quarter 8/12 | Patria-class under construction
BB |1x Africa |50 | 50 |Quarter 8/12| Patria-class under construction
BB |1x Tasmania |50 | 50 |Quarter 7/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 7/8 | Tevere-class, launched and fitting out
CA |1x Mosca |17 | 0.85 |quarter 7/8 | Tevere-class, launched and fitting out

CV |1x Cigno |22 |1.1 |quarter 8/8 | as HMS Courageous; trials
CV |1x Albatro |22 |1.1 |quarter 8/8 | as HMS Courageous; trials
BB |1x Oceano | 0 | 0 |Quarter 12/12 |1 Il Principe-class finished

Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class 1.5 | 1 |Quarter 4/4 | fitting out

MAS:
100 for Tuscany (150 ts each, 1.5 pts), under construction

completed in previous quarter:
100 for Tuscany (150 ts each)


Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.

Aircraft

Series production:
25 pts for the acquisition of license-built Hawker Horsley bombers (12 Squadrons)
4 points to acquire spare parts to get the four Horsley squadrons in storage into service
4 Squadrons of Flycatcher fighters 4 pts

Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 2/4)
20 pts: arms and equipment upgrade – new uniforms, better grenades, rifles,…

11,6 points to improve coastal defenses (construct bunkers, etc.)

420 points spent in total for Q4/1926

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-12 05:18pm
by Shinn Langley Soryu
Southeast Asian Union

GAME STATS

Basic industrial points: 420 points / quarter (Industry 4 = 400 points / quarter, industrial improvements = +20 points / quarter)
Economic bonuses: Economy 4 = +5% points during peacetime, +100% points during wartime
Total industrial points: 441 points / quarter during peacetime, 840 points / quarter during wartime

CONSTRUCTON ORDERS (Q4 1926)

Army

N/A

Air Force

N/A

Navy

18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 3.2 IBPs (laid down January 1926, construction complete October 1926, trials complete January 1927)
18 x Hirano class destroyer (Fubuki class destroyer analogue; 1,780 tons standard, 1.8 IBP each) = 32.4 IBPs (laid down July 1926, construction complete April 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 2.1 IBPs (laid down July 1925, construction complete July 1926, trials complete January 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1927)
3 x Cagayan de Oro class heavy cruiser (Aoba class heavy cruiser analogue; 7,100 tons standard, 7.1 IBP each) = 21.3 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down January 1926, construction complete January 1927, trials complete July 1928)
3 x Angeles class heavy cruiser (Myoko class heavy cruiser analogue; 10,000 tons standard, 10 IBP each) = 30 IBPs (laid down July 1926, construction complete July 1927, trials complete January 1928)
3 x 25-40kT slipway = 45 IBPs (construction complete January 1927)
2 x 40-55kT slipway = 40 IBPs (construction complete January 1927)
2 x 55-70kT slipway = 50 IBPs (construction complete January 1928)

Industrial

Industrial improvements = 100 IBPs (+25 IBPs starting January 1927)
Economic improvements = 65 IBPs (185/500 IBPs total, Economy = 5 starting January 1929)

NOTES

80 "free" IBPs have been given retroactively due to revisions of the tech upgrade rule.

Surplus remaining: 30.7 IBPs

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-12 07:21pm
by Fingolfin_Noldor
1926Q4

Note: additional 22 IBPs for this year

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (120 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
General Improvement: 20 points
Infrastructural Improvement: 20 points
Economic Improvement: 20 points
Industrial Improvement: 20 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 285 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 52 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **
General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 26 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
24 US R-class submarines (improved) in trials till end Q4 1926 = 0.05*24*.57 = 0.684 points
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
6 U-139 (improved) in trials till end Q4 1926 = 0.05*6*1.9 = 0.57 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
8 destroyers laid down (Fubuki class) in trials till end Q4 1926 = 0.05*8 * 1.75 = 0.7 points
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 42.06 points (partial funding, 57.6-41.06 - 1 = 15.54)

Total points: 209 + 18.87 (from surplus) points

***: 1 for the Balkan Confederacy

Total: 572 points (about)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 16.54 points (partial)
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 18.87 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession ~ 5 years (Start Q3 1926)
Project Eagle ~ 4 years (Start Q3 1926)
Project StarStruck ~ 2 years (Star Q3 1926)

Surplus left : 224.5 points (Aid to be repaid later.)

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-13 12:19pm
by CmdrWilkens
Industrial Projects of the Mexican Empire

Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
524 In Use


Q1 1927 Current Projects

Army: (82)
  • Upgrades: (72)
    • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
    Acquisitions: (10)
    • One Brigade upgrade to New Model (1927 Medium Tank) Armored Brigade (10 pts) [Started Q1 1917, Complete Q4 1927]

Navy: (109)
  • Slipways: (40)
    • Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
    Acquisitions: (69)
    • Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
      Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Compelte Q3 1927, Trials Q4 1927)]
      Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

Air Force: (138)
  • Aquisitions: (88)
    • 400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    Technology: (50)
    • Air Tech 3 to Air Tech 4 [(50pts/qtr for 1 year, 1pt/qtr for 1 year) (Started Q1 1927, Complete Q4 1928)]

Other: (195)
  • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
    Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)
    Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
    Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

=======================
Q1 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
=======================
Q2 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
=======================
Q3 1925:
  • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
    III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
    160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
    One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
=======================
Q4 1925:
  • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
    7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
    80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
=======================
Q1 1926:
  • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
    80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
    Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
=======================
Q2 1926:
  • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
    80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
    Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
=======================
Q3 1926:
  • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
=======================
Q4 1926:
  • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
    Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
    Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
    Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
    Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
=======================

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-13 03:17pm
by Steve
Q1 1927 Construction Queue

Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

National Projects:

Air Tech 4 = 20 IBPs, 160/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 65 IBPs, 220/500, started January 1925
Nicaragua Canal Project = 20 IBPs

Total Cost: 200 IBPs


Army

6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
6 Infantry Divisions = 12 IBPs, complete in January 1927, max effectiveness in July 1928
4 Artillery Brigades = 12 IBPs, complete in January 1927, max effectiveness in January 1928
Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


Total Cost: 102 IBPs


Navy

1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
4 Defiant-class (55,000t) = 220 IBPs (construction phase complete in April/July 1927, full completion in March-July 1928)

Total Cost: 250.9 IBPs


Air Force

20 1924-model transport aircraft = 10 IBPs (completion April 1927)
20 1924-model heavy bomber aircraft = 10 IBPs (completion January 1927)
4 prototype 1925-model carrier-based fighter/bomber aircraft = 4 IBPs (completion January 1927)

Total Cost: 10 BPs

Overall Expenditures: 564.9/566.5 IBPs


Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928

Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-13 07:01pm
by Siege
Egyptian Sultanate

466 pts/quarter

Q1, 1927

National Projects 100

100 Industrial Improvement

Army 95

45 5x Motorized Infantry Division (1/4)
50 5x Armored Brigade (1/4)

Air Corps 186

20 SMI-22R Recon Monoplane Prototype
20 KTW Storm Petrel Biplane Torpedobomber Prototype
25 250x Breguet 19
100 50x SMI Abdullag V/2500
21 210x Blackburn Dart

Navy 80

1 Qansuh al-Ghawri class Fast Battleship (50 KT) (3/8)
1 Leander class cruiser (10 KT) (3/4)
2 Leander class cruiser (10 KT) (1/4)

Foreign Orders

5 50x Reconnaissance fighters (1927)*
10 100x Pursuit fighters (1927)*
5 100x Fighter-bombers (1927)*
12 100x Heavy Bombers (1927)*

* Byzantine orders

RESEARCH SLOTS:

Slot 1: Cruiser Tank Design
Started: January 1925
Complete: October 1927

Slot 2: Point-to-point radio communication
Started: July 1926
Complete: January 1929

Slot 3: Battlefield rocketry
Started: July 1926
Complete: ????

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-13 09:58pm
by RogueIce
United States of America - Q1 FY1927 (January)

Total: 550 IBPs (5 IND/5 ECON)

National Projects
Air Tech 4: 25 (Upgrade complete!)
Army Tech 4: 25 (Upgrade complete!)
Upgrade Industrial Capacity: 100
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)

United States Navy
Building Fitting out South Dakota class BB (43200t): 43.2 2.16 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Building Fitting out South Dakota class BB (43200t): 43.2 2.16 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Fitting out Lexington class CV (36000t): 18 0.9 (Construction complete JAN 1927; Fitting out complete JAN 1928)
Converting Fitting out Lexington class CV (36000t): 18 0.9 (Construction complete JAN 1927; Fitting out complete JAN 1928)
4x Tampa CA (24610t): 98.4 (Construction complete APR 1927; Fitting out complete JAN 1928)
8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
8x Farragut DD {Fubuki type} (1800t): 14.4 (Construction complete APR 1927; Fitting out complete JUL 1927)
40 FB [Boeing Model 15]: 4 (Complete APR 1927)
30 SC [Curtiss CS]: 3 (Complete APR 1927)

United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
Upgrading 1st Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading 4th Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading Artillery Brigade (attached I Corps) to Motorized Towed Artillery: 6 (Complete JAN 1928)
Forming 4 Armored Recon Battalions: 8 (Complete JAN 1928)

United States Army Air Corps
40 P-5 [Boeing Model 15]: 4 (Complete JAN 1927)
20 A-1 [Airco DH.4]: 2 (Complete JAN 1927)
40 A-2 [Curtiss Falcon]: 4 (Complete JAN 1927)
30 O-2 [Curtiss Falcon]: 3 (Complete JAN 1927)
30 B-1 [Martin NBS-1]: 3 (complete JAN 1927)
20 C-1 [Douglas C-1]: 10 (Complete JAN 1927)
40 P-5 [Boeing Model 15]: 4 (Complete APR 1927)
20 A-2 [Curtiss Falcon]: 2 (Complete APR 1927)
10 O-2 [Curtiss Falcon]: 1 (Complete APR 1927)
40 C-1 [Douglas C-1]: 20 (Complete APR 1927)

TOTAL: 505.72 / 550

Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1925
Complete: October 1927

Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-14 12:49pm
by Thanas
Germany Q1 1927

Note: preliminary. May still change.

Q1 1927:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948

Shipyards: -110
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete April 1927)
- 50 for construction of 2 new 55-70 kt (complete August 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete August 1927)

Investments: -145
- 20 for canal project
- infrastructure upgrade Dutch: 62,5 (total invested 187,5/500)
- economy upgrade dutch territories: 62,5 (total invested 187,5/500)

Army: 0

Navy: -659.8
- 1,8 for fitting out CV (complete Q4 1927)
- 220 for new construction (2 Imperator, 2 Scharnhorst class BC, launch April 1927)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q 3 1927, finished Q 3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q3 1927, finished Q3 1928)
- 4 for fitting out of 4 Heavy cruisers (finished Q3 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 60 for 6 Hamburg class cruisers (launch Q1 1927, ready Q4 1927)
- 16 for refit of 1 Ziethen class BC (ready Q2 1927)
- 16 for refit of 1 L20alpha class BB (ready Q2 1927)
- 130 for 2 65kt BC (launch Q4 1928)
- 128 for refit of 3 L20alpha and 4 Einheit class BB (ready Q3 1927)

Naval Air Arm: -24,2
- 7,2 for 72 Dornier Do-H
- 18 for 180 torpedo bombers

Air force: - 12
- 10 for first payment to the Balkan Confederacy
- 0,4 for 4 Fokker D. XIV
- 0,4 for 4 Gloster Grebe
- 1 for 10 Fokker D.XIII
- 0,2 for 2 transport planes

Others: +7
- 14 for coastal shipping initiative (total invested: 51)
+ 11 from scrapping SS Bremen
+ 10 surplus from SH shell research

left: 0


New research projects:

- dive bombers started Q1 1927
- standardization/mass production of merchant ships/escorts started Q1 1927
- early radar (may change)


Completed research:
- superheavy shells
- 100kt shipyard
- 20" guns[/s]

Completed at end of this quarter:
- 4 Gloster Grebe
- 10 Fokker D.XIII
- 2 transport planes
- coastal shipping initiative (total invested 65)
- 180 torpedo bombers
- 72 Dornier Do-H
- refit of 1 Ziethen class BC (ready Q2 1927)
- refit of 1 L20alpha class BB (ready Q2 1927)
- upgrade of 2 55kt yards to 55-70kt yards

Ships launched:
- 2 Scharnhorst class BCs
- 2 Imperator class BBs


Gained from Spain in exchange for own technology research:
- long range transport planes
- improved armor manufacturing capabilities
- improved ASDIC

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-14 10:20pm
by Beowulf
Manchuria

Q4/1925
525 pts available

National projects:
48pts economy improvement

Army:
Units:

5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 2/4
3 Infantry division motorization - 9 points ea - 27 points 2/4
+1 Armor Regiment - 10 points 2/4
40 points

4 Armored Brigades (for upgrade of secondary reserve Corps) 3/4
40 pts

2 Motor Artillery Brigade - 6 points 2/4
4 Armor Regiment - 10 points 2/4
52pt

Complete:
12 Infantry division - 2 points ea - 6 points 1/2

suspended:
2 Motor Artillery Brigade - 6 points 2/4
8 Armor Regiment - 10 points 1/4


Cancelled:
12 Motor Infantry division - 9 points ea - 27 points 2/4
12 Motor Infantry division - 9 points ea - 27 points 1/4
12 Infantry division - 2 points ea - 27 points 1/2
International Volunteer Division - 3 pts 1/2
4 Artillery Brigade - 3 points 2/4
4 Motor Artillery Brigade - 6 points 1/4
4 Artillery Brigade - 3 points 1/4


Aircraft:
30 J-2 - 3 points

183 pts total

Fortresses:
Defense line Yat densification
Hailar He/Heilongjiang Section - 3 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 33 pts 3/4 complete

Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 3/4 complete
44pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 3/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 3/8 complete Winter 1927- Incheon Naval Shipyard
35pts total

Ships:
4 CA1923 - 2.5pts/qtr ea 8/8 complete 3/4 fitting out
2 BB1925 - 40 pts/qtr ea 3/8 complete
2 CA1925 - 53 pts/qtr ea 3/8 complete
4 CS1923 - 12.1 pts/qtr ea 3/5.33 complete
12 DD1923 - 1.2pts/qtr 1/3 complete

4 DD1923 - 1.2 pts/qtr 3/3 complete

258.8pts total

Aircraft:

Remaining 4.2 pts

Q1/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:

5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 3/4
3 Infantry division motorization - 9 points ea - 27 points 3/4
+1 Armor Regiment - 10 points 3/4
40 points

2 Motor Artillery Brigade - 6 points 3/4
4 Armor Regiment - 10 points 3/4
4 Armor Regiment - 10 points 1/4
2 Motor Artillery Brigade - 6 points 2/4

Complete:
4 Armored Brigades (for upgrade of secondary reserve Corps) 4/4

suspended:
4 Armor Regiment - 10 points 1/4

Aircraft:
30 Q-3 - 3 points

183 pts total

Fortresses:
Defense line Yat densification
Hailar He/Heilongjiang Section - 3 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts ea = 33 pts 4/4 complete
Heilongjiang-Waihsinganling Section - 1 Fort Div - 11 pts 4/4 complete
44pts total

Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 0/4 complete

Repair of war damaged fortifications
11 pts 0/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 0/4 complete
48 pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 4/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 4/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 0/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 4/8 complete
2 CA1925 - 53 pts/qtr ea 4/8 complete
4 CS1923 - 12.1 pts/qtr ea 4/5.33 complete
12 DD1923 - 1.2pts/qtr 2/3 complete

4 CA1923 - 2.5pts/qtr ea 8/8 complete 4/4 fitting out
Aircraft:
30 Q-3

226.8pts total

Remaining 7.2 pts

Q2/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
60pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
2 Motor Artillery Brigade - 6 points 3/4
92pts

Complete:
5th Infantry Corps - Motorized Infantry Corps conversion (Army of Korea)
Artillery Brigade motorization - 3 points 4/4
3 Infantry division motorization - 9 points ea - 27 points 4/4
+1 Armor Regiment - 10 points 4/4
2 Motor Artillery Brigade - 6 points 4/4
4 Armor Regiment - 10 points 4/4


Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 1/4 complete

Repair of war damaged fortifications
11 pts 1/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 1/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 0/4 complete


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 5/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 5/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 1/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 5/8 complete
2 CA1925 - 53 pts/qtr ea 5/8 complete
4 CS1923 - 12.1 pts/qtr ea 5/5.33 complete
12 DD1923 - 1.2pts/qtr 3/3 complete 0/1 fitting out

Aircraft:
30 Q-3

226.8pts total

Remaining 6.2 pts

Q3/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div
1 Artillery Regt
9 pts


Complete:
2 Motor Artillery Brigade - 6 points 4/4

Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 2/4 complete

Repair of war damaged fortifications
11 pts 2/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 2/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 1/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 6/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 6/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 2/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 6/8 complete
2 CA1925 - 53 pts/qtr ea 6/8 complete
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete .67/2.67 fitting out
12 DD1923 - 1.2pts/qtr 3/3 complete 1/1 fitting out

Aircraft:
20 Q-3

191.4 pts total

Remaining 0.6 pts

Q4/1926
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div 1/2
1 Artillery Regt 1/4
9 pts


Complete:
4 Armor Regiment - 10 points 4/4

Aircraft:
30 Q-3 - 3 points

143 pts total

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 3/4 complete

Repair of war damaged fortifications
11 pts 3/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 3/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 2/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 7/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 7/8 complete Winter 1927- Incheon Naval Shipyard
1 new 70kton slips - 25 points, 3/8 complete Winter 1928 - Incheon Naval Shipyard
60pts total

Ships:
2 BB1925 - 40 pts/qtr ea 7/8 complete
2 CA1925 - 53 pts/qtr ea 7/8 complete
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete 1.67/2.67 fitting out

Aircraft:
20 Q-3

191.4 pts total

Remaining 0.6 pts

Q1/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
48pts economy improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
3 Infantry Div 1/2
1 Artillery Regt 1/4
9 pts

Reserve Infantry divisions:
6 inf div 0/2
12 pts


Complete:
4 Armor Regiment - 10 points 4/4

Aircraft:
30 Q-3 - 3 points

Fortresses:
Defense line Yat densification
Previously cancelled Hailar He/Heilongjiang Section - 1 Fortress division = 2 Artillery Brigade + Siege Artillery BDE equivalent - 11 pts 4/4 complete

Repair of war damaged fortifications
11 pts 4/4 complete

Defense line San creation
16 fortress brigades - 3pts ea 4/4 complete
48 pts total


Defense line San creation
16 fortress brigades - 3pts ea 0/4 complete
48 pts total


Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 3/4 complete

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 8/8 complete Winter 1927 - Lushunko Naval Shipyard
1 40kton slip upgrade - 10 points, 8/8 complete Winter 1927- Incheon Naval Shipyard
35pts total

1 new 70kton slips - 25 points, 4/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 0/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 0/4 fitting out
2 CA1925 - 53 pts/qtr ea 0/8 complete 0/4 fitting out
4 CS1923 - 0.6 pts/qtr ea 5.33/5.33 complete 2.67/2.67 fitting out
3 CS1927 - 15 pts/qtr ea 0/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 0/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 0/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 3.7 pts

Q2/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
56pts economy improvement - economy improvement cost satisfied, completion by 1928q1

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
1 Artillery Regt 2/4
3 pts

Reserve Infantry divisions:
6 inf div 1/2
12 pts

Motor Infantry Divisions:
5 motor inf div 0/4
45 pts


Complete:
4 Armor Regiment - 10 points 4/4
3 Infantry Div 1/2


Aircraft:
30 Q-3 - 3 points

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 1/4 complete
48 pts total

Defense line Wu creation - located north of Heilongjiang
4 fortress division - 11 pts 4/4 complete


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 5/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 1/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 1/4 fitting out
2 CA1925 - 53 pts/qtr ea 1/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 1/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 1/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 1/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 0.7 pts

Q3/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
0pts economy improvement - economy improvement cost satisfied, completion by 1928q1
40 pts industrial improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts

Reserve Corps
1 Artillery Regt 3/4
3 pts

Reserve Infantry divisions:
6 inf div 0/2
12 pts


Motor Infantry Divisions:
5 motor inf div 1/4
45 pts


Complete:
4 Armor Regiment - 10 points 4/4
6 inf div 2/2


Aircraft:
30 Q-3 - 3 points
10 J-3 prototype - 10 pts

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 2/4 complete
48 pts total

Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 6/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 2/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 2/4 fitting out
2 CA1925 - 53 pts/qtr ea 2/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 2/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 2/5 complete 0/3 fitting out
5 SS1927 - 1.8 pts/qtr ea 2/3 complete 0/1 fitting out

Aircraft:
30 Q-3

222.3 pts total

Remaining 6.7 pts

Q4/1927
550 pts available
-500 base
-25 economy
-25 reparations from Russia

National projects:
0pts economy improvement - economy improvement cost satisfied, completion by 1928q1
40 pts industrial improvement

Army:
Units:
4 Armor Regiment - 10 points 0/4
4 Armor Regiment - 10 points 1/4
4 Armor Regiment - 10 points 2/4
4 Armor Regiment - 10 points 3/4
160pts


Reserve Infantry divisions:
6 inf div 1/2
12 pts

Motor Infantry Divisions:
5 motor inf div 2/4
45 pts


Complete:
1 Artillery Regt 4/4
4 Armor Regiment - 10 points 4/4


Aircraft:
30 Q-3 - 3 points
10 J-3 prototype - 10 pts

Fortresses:

Defense line San creation
16 fortress brigades - 3pts ea 3/4 complete
48 pts total

4 fortress brigades - 3pts ea 0/4 complete
12 pts total


Navy:
Slipway improvements:
1 new 70kton slips - 25 points, 7/8 complete Winter 1928 - Incheon Naval Shipyard

Ships:
2 BB1925 - 2 pts/qtr ea 8/8 complete 3/4 fitting out
2 CA1925 - 2.65 pts/qtr ea 8/8 complete 3/4 fitting out
2 CA1925 - 53 pts/qtr ea 3/8 complete 0/4 fitting out
3 CS1927 - 15 pts/qtr ea 3/5 complete 0/3 fitting out
1 CV1927 - 25 pts/qtr ea 3/5 complete 0/3 fitting out
5 SS1927 - .09 pts/qtr ea 3/3 complete 0/1 fitting out

Aircraft:
30 Q-3

217.8 pts total

Remaining 9.2 pts

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-15 09:45am
by Fingolfin_Noldor
1927Q1

Base: 500 IBP
Added: 40 IBP
Bonus: 54 IBP
Total: 594 IBP

Miscellaneous Research Projects (Television, Radar, Fundamental Science etc.): 80 points
Air Force Tech 3 to 4 upgrade: 20 points (160 points thus far)
Upgrading 2 25-40kT Slipways to 40-55kT capacity = 20 points (Completion Date: End 1926Q4, both at the Constantinople Naval Arsenal)
Construction of 3 55-70kT Slipways: 75 points (Completion Date: End 1926Q4, 2 at Constantinople Naval Arsenal, 1 at the Athenian Naval Arsenal)
Construction of 2 55-70kT Slipways = 50 points (Completion Date: End 1927Q4, 1 at Athens Naval Arsenal, 1 at Basra Naval Arsenall)
Investment: 100 points
Fortifications in Persia/Constantinople/Athens/Basra/Taranto/Carthage/Crete/Malta: 20 points
Nicaragauo Canal Project: 20 points

Total: 210 points

Army

Motorization: 7 infantry divisions till end Q4 1925 = 7 * 7 = 49 points
Motorization: 4 artillery brigades till end Q4 1925 = 4 * 3 = 12 points
6 motorized artillery brigades raised till end Q4 1925 = 6 * 6 = 36
Motorization: 2 infantry divisions till end Q2 1926 = 7 * 2 = 14 points
Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points *
4 tank brigades till end Q1 1927 = 4 * 10 = 40 points
Motorization: 4 artillery brigades till end Q1 1927 = 4 * 3 = 12 points
Motorization: 7 infantry divisions till end Q4 1927 = 7 * 7 = 49 points *
3 Varangian Guard Bde = 3*3 = 9 points
BT tank analogue prototype = 1 point
T-26 analogue single turret prototype = 1 point
T-28 analogue prototype = 1 point
Self-Propelled Artillery Prototype in T-35 chassis = 1 point

General research = 10 points (e.g. guns, vehicle suspension etc.)

Total = 61 points

*: To be completed by the Balkan Confederacy

Note: These tanks are long term projects. No expectation for ordering and deployment until 1929.

Air Force

4 Fairey Fox analogue prototypes = 4*1 = 4 points
4 bomber prototypes = 4*1 = 4 points (type to be determined)
4 heavy bomber prototypes = 4*1 = 4 points (type to be determined)
4 reconnaissance fighter prototypes = 4 points (type to be determined)

50 Reconnaissance fighters (1926) = 5 points **
100 Pursuit fighters (1926) = 10 points **
50 Fighter-bombers (1926) = 5 points **
12 Heavy Bombers (1926) = 6 points **

50 Reconnaissance fighters (1927) = 5 points **
100 Pursuit fighters (1927) = 10 points **
50 Fighter-bombers (1927) = 5 points **
24 Heavy Bombers (1927) = 12 points **

General research = 10 points (e.g. jet fighter, rotary aircraft etc.)

Total: 32 points

**: To be built by the Sultanate

Navy

4 carrier fighter bomber prototypes = 4 points
4 carrier scout fighter prototypes = 4 points
4 carrier pursuit fighter prototypes = 4 points

4 Justinian-class Battleships in trials till end of end Q4 1925 - 0.05*50*4 = 10 points (Construction beginning in Jan 1923)
4 Sparta-class Heavy Cruisers in trials till end Q4 1925 - 0.05*16.9*4 = 3.38 points (Construction beginning in Jun 1924)

16 minelayers/minesweepers (1kt each) in trials till end Q4 1925 = 0.05*16 = 0.8 points
12 destroyers laid down (Chacal class) in construction till end Q4 1925 = 16 * 2.12 = 24.44
4 light cruisers laid down (Pensacola class) in construction till end Q1 1926 = 4 * 9.1 = 36.4 points
4 light cruisers laid down (Pensacola class) in trials till end Q2 1926 = 0.05 * 4 * 9.1 = 1.82 points
General research = 10 points (e.g. torpedoes, guns etc.)
6 U-139 (improved) in construction till end Q3 1926 = 6*1.9 = 11.4 points
6 U-139 (improved) in trials till end Q4 1926 = 0.05*6*1.9 = 0.57 points
8 destroyers laid down (Fubuki class) in construction till end Q3 1926 = 8 * 1.75 = 14 points
8 destroyers laid down (Fubuki class) in trials till end Q4 1926 = 0.05*8 * 1.75 = 0.7 points
24 US R-class submarines (improved) in construction till end Q3 1926 = 24*.57 = 13.68 points
24 US R-class submarines (improved) in trials till end Q4 1926 = 0.05*24*.57 = 0.684 points
3 John II Komenenos Battleships under construction till end of end Q4 1927 (55,000tonnes) = 55*3 = 165 points ***
2 Heraclius class Battleships under construction till end of end Q4 1928 (65,000tonnes) = 65*2 = 125+5 points (5 from surplus)
4 Minelayers/Minesweepers (1kt each) in construction till end Q1 1927 = 4 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 42.06 points (partial funding, 57.6-41.06 - 1 = 15.54)
32 destroyers laid down (Fubuki class) in trials till end Q1 1927 = 0.05*16* 1.8 = 0.144

Total points: 289.15 points

***: 1 for the Balkan Confederacy

Total: 594 points (about. This also accounts for 6 additional IBPs paid by Balkan Confederacy)

110*4 IBPs surplus
To be spent on

16 Minelayers/Minesweepers (1kt each) in contruction till end Q1 1927 = 16 points
32 destroyers laid down (Fubuki class) in construction till end Q4 1926 = 16* 1.8 = 16.54 points (partial)
2 Sparta cruiser carrier conversion (8.1 points each). Construction till End Q2 1927, trials from Q3 to end Q4 1927 = 16.2 points
198 IBPs aid to an unknown source. (One time in 1926Q2)

Research
Project Confession I ~ 3 years (Start Q1 1925)
Project Eagle I ~ 2 years (Start Q1 1925)
Improved Armor Manufacturing Techniques ~ 3 years (Start Q1 1927)
Project StarStruck ~ 2 years (Start Q1 1925)


Surplus left : 222.0 points (Aid to be repaid later.)

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-18 11:26am
by DarthShady
The Balkan Confederacy
Construction Queue - (Q1, Q2, Q3, Q4) - 1926

Total IBP's: 400 IBPs(4 Industry) + 5%(4 Economy) = 420 IBP's

Q1, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (5/8)
2x 55-70kT Slip =50 IBP's (5/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (5/8)
3x Armored Brigade = 30 IBP's (5/8)

5x Armored Recon Battalion = 10 IBP's (1/4)
5x Motorized Artillery Brigade =30 IBP's (1/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (1/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (1/4)

*: For the Byzantine Empire

Air Force
100 Avia BH-21 = 10 IBP's
200 Fokker D.XIV = 20 IBP's
200 Gloster Grebe = 20 IBP's

100 Blackburn Dart = 10 IBP's
80 Vickers Virginia = 40 IBP's

4 Airship Carrier = 20 IBP's (1/2)

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (1/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (1/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (1/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q2, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (6/8)
2x 55-70kT Slip =50 IBP's (6/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (6/8)
3x Armored Brigade = 30 IBP's (6/8)

5x Armored Recon Battalion = 10 IBP's (2/4)
5x Motorized Artillery Brigade =30 IBP's (2/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (2/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (2/4)

*: For the Byzantine Empire

Air Force
100 Avia BH-21 = 10 IBP's
200 Fokker D.XIV = 20 IBP's
200 Gloster Grebe = 20 IBP's

100 Blackburn Dart = 10 IBP's
80 Vickers Virginia = 40 IBP's

4 Airship Carrier = 20 IBP's (2/2)

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (2/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (2/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (2/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q3, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (7/8)
2x 55-70kT Slip =50 IBP's (7/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (7/8)
3x Armored Brigade = 30 IBP's (7/8)

5x Armored Recon Battalion = 10 IBP's (3/4)
5x Motorized Artillery Brigade =30 IBP's (3/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (1/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (3/4)

*: For the Byzantine Empire

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (3/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (3/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (3/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Q4, 1926

National Projects
Industrial investment in Industry level upgrade = 20 IBP's
2x 25-40kT Slip =30 IBP's (8/8)
2x 55-70kT Slip =50 IBP's (8/8)

Army
3x New Motorized Infantry Divisions = 27 IBP's (8/8)
3x Armored Brigade = 30 IBP's (8/8)

5x Armored Recon Battalion = 10 IBP's (4/4)
5x Motorized Artillery Brigade =30 IBP's (4/4)

20x Activations of Reserve Infantry Divisions for Regular service = 20 IBP's (2/2)

Motorization: 7 infantry divisions till end Q4 1926 = 7 * 7 = 49 points * (4/4)

*: For the Byzantine Empire

Navy
10 x submarines - German Type U 139 submarine (1,930 tons) 20kt(rounded) = 20 IBP's (4/4)
8 x Destroyers (Fubuki class) = 8 * 1.75 = 14 IBP's (4/4)

1 John II Komenenos Battleship under construction till end of end Q4 1927 (55,000tonnes) = 55 IBP's (4/8) *

*: Built by the Byzantine Empire

Total: 420 IBP's

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-23 12:33pm
by Doomriser
Bolivarian Union

Q1 1927

National Projects

40 IBP for industrial expansion
15 IBP for 5 100/200-line (interlaced) television transmitters and television distribution
20 IBP for employment equity

= 75 IBP

Air

20 NiD 42 = 2 IBP
20 Dewoitine D 21 = 2 IBP
20 F8C = 2 IBP
100 Siskin IIIA = 10 IBP
24 TB-1 = 12 IBP
70 Trainers = 7 IBP
Horsely Prototype = 5 IBP
Horsely engine replacements = 10 IBP
R-6 Escort Fighter Prototype [Model 1924] = 2 IBP
Savoia-Marchetti S.55 Flying Boat [Model 1924] Prototype = 5 IBP

= 57 IBP

Naval

(See Q4 1926) 106 IBP
4 IBP for begin build of 9 H21-class coastal submarines
5 IBP for begin build of 5 Evolved Mittel-U submarines

= 115 IBP

Army

Continuing production of 6 motorized infantry brigades = 18 IBP
Upgrade two coastal fortresses to 16.5-inch guns purchased from Brazil = 30 IBP
Begin light amphibious tank prototype = 15 IBP

= 63 IBP

= 310 IBP

--

Q2 1927


National Projects

75 IBP (see Q1)

Air force

20 NiD 42 - 2 IBP
60 Siskin IIIA - 3 IBP
36 TB-1 - 18 IBP
50 Trainers - 5 IBP
R-6 Escort Fighter Prototype Evaluation - 4 IBP
S-55 Flying Boat Prototype Evaluation - 5 IBP

Undisclosed number of aircraft for Tuscan Kingdom [paid for by Tuscan Kingdom] + 1 IBP Profit)

Begin construction of coastal "sisters" to Talara and Lima AFB = 10 IBP (Complete Q2 1929)

= 47 IBP

Navy

(see Q1, 1927)

= 115 IBP

Army

Complete upgrade of 6 brigades to fully-motorized status = 18 IBP
Complete upgrade of two coastal fortresses to 16.5-inch guns purchased from Brazil - 30 IBP
Continue light amphibious tank prototype - 25 IBP

= 73 IBP

= 310 IBP

Q3 1927

National Projects

40 IBP for industrial expansion
20 IBP for employment equity
10 IBP for 3 100/200-line (interlaced) television transmitters and television distribution

= 70 IBP

Air

12 Squadrons of Hawker Horsely = 25 IBP
100 NID 42 = 10 IBP
20 F8C = 2 IBP
100 Siskin IIIA = 10 IBP
48 TB-1 = 24 IBP
30 Trainers = 3 IBP
Fairey Fox Prototype = 1 IBP
R-6 Escort Fighter Second Prototype [Model 1924] = 3 IBP
Savoia-Marchetti S.55 Flying Boat Production Prototype = 5 IBP
Night Bomber Prototype = 5 IBP
Coastal Airbases - 10 IBP

Total = 98 IBP

Army

Continue Light Amphibious Tank Prototype - 20 IBP
Upgrade 12 brigades to fully-motorized status - 36 IBP

= 56 IBP

Naval

86 IBP [See Q2 minus 29 IBP for ships from Q4 1926 that are now in trials]

= 310 IBP

Q4 1927

National Projects

40 IBP for industrial expansion
20 IBP for employment equity
10 IBP for 3 100/200-line (interlaced) television transmitters and television distribution

= 70 IBP

Air

6 Squadrons of Hawker Horsely = 13 IBP
40 NID 42 = 4 IBP
30 Siskin IIIA = 3 IBP
48 TB-1 = 24 IBP
20 Trainers = 2 IBP
Fairey Fox Prototype Evaluation = 1 IBP
R-6 Escort Fighter Second Prototype Evaluation [Model 1924] = 3 IBP
Savoia-Marchetti S.55 Flying Boat Production Prototype Evaluation = 5 IBP
Night Bomber Prototype Evaluation = 5 IBP
Coastal Airbases - 10 IBP

= 70 IBP

Naval

75 IBP existing construction (30 of which is Sparta-class cruisers)
Begin build of 20 Rupicola-class torpedo boats = 19 IBP
Begin build of 6 Fubuki-class destroyers = 11 IBP
Prototype Super Rupicola Torpedo Boat = 1 IBP
1 IBP trials

=107 IBP

Army

Complete Light Amphibious Tank Prototype - 20 IBP
Upgrade 10 brigades to fully-motorized status - 30 IBP

= 56 IBP


Research

Slot 1: Project 940 (With Brazil)
Started: January, 1926
Complete: January, 1931

Slot 2: 22.4-inch Air-dropped Torpedo
Started: July, 1926
Complete: July, 1929

Slot 3: Television Applications Program
Started: January, 1927
Complete: June, 1927

Slot 3: Project Owl
Started: June, 1927
Complete: ?

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-27 09:24am
by loomer
Afghanistan, Q1 1927
Total allowance: 210

New Projects:
25-40kT slipway in Kandahar (why yes, it's a desert. All part of the sinister plan.): 15 points

Infrastructure Investments:
Army Recruitment Incentives (for AF:2): 50 points (now 300 points, final invest for AF:2 unless anyone objects)
Tank manufactory program: 40 points (total now 150 + 10, final invest)
Production investments: 20 points
National Railroad Project: 10 points (for IF:2/3. At somewhere around ~80 points now)
Air Force Modernization Program (to AFT:3): 20 points (now 80 total)
Fort Modernization Program: 20 points (Now 70 total)

War Payments to Unknown Beneficiaries: 30 points

Research: Project Manpower Mark 2 (Small Arms and support guns)
Research: Project Iron (Taaaaaanks)
Research: Project Toothpaste (Plaaaaaaague)

Surplus: 5 points

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-27 11:02pm
by CmdrWilkens
Industrial Projects of the Mexican Empire

Industry Level: 5 (+5 pts investment, +5% Econ=4)
530 pts available
522.8 In Use


Q2 1927 Current Projects

Army: (58)
  • Upgrades: (48)
    • Sixteen (16) Brigades upgrade to Motor Transport (3 pts) [Started Q2 1927 Complete Q1 1928]
      One (1) Brigade upgraded to Armored Bde (see below) (2 pts) [Started Q2 1927 Complete Q1 1928]
    Acquisitions: (10)
    • Brigade acceptance testing New Model (1927 Medium and 1925 Light Tank) (10 pts) [Started Q1 1917, Complete Q4 1927]

Navy: (157.8)
  • Slipways: (40)
    • Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
    Acquisitions: (117.8)
    • Two (2) Hispaniola class Aircraft Carriers: 48.8 pts [(2 ships at 24.4 kt with 1pt/1 kt) (Started Q2 1927, Complete Q2 1928, Trials Q1 1929)]
      Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
      Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]
      Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

Air Force: (112)
  • Aquisitions: (62)
    • 160 Fighters (2 wings) PW.9 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      160 Attack Fighters (2 wings) HP.24 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      20 Transport Planes (1 Squadron plus fill out) T.11 (10 pts) [(20 planes at 1pt/2) )Started Q2 1927 Complete Q2 1927)]
      Acceptance testing on TBN.1 Torpedo Plane [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Acceptance testing on FN.1 Naval Fighter [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
    Technology: (50)
    • Air Tech 3 to Air Tech 4 [(50pts/qtr for 1 year, 0pt/qtr for 1 year) (Started Q1 1927, Complete Q4 1928)]

Other: (195)
  • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
    Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)
    Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
    Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

============================================================
Completed Items
As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

=======================
Q1 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
=======================
Q2 1925:
  • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
    80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
=======================
Q3 1925:
  • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
    III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
    160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
    One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
=======================
Q4 1925:
  • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
    7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
    80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
=======================
Q1 1926:
  • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
    80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
    Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
=======================
Q2 1926:
  • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
    80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
    80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
    Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
    Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
=======================
Q3 1926:
  • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
=======================
Q4 1926:
  • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
    Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
    Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
    Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
    Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
=======================
Q1 1927:
  • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
    400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-28 02:22am
by Steve
Q2 1927 Construction Queue

Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

National Projects:

Air Tech 4 = 20 IBPs, 180/200, started January 1925, minimum completion January 1927
Upgrading 2 25-40kT Slipways to 55-70kT capacity = 40 IBPs (Completion Date April 1927)
Upgrading 2 40-55kT Slipways to 55-70kT capacity = 30 IBPs (Completion Date April 1927)
Building new 55-70kT Slipway = 25 IBPs (Completion Date April 1927)
Infrastructure Upgrades = 90 IBPs, 285/500, started January 1925
Nicaragua Canal Project = 20 IBPs

Total Cost: 105 IBPs


Army

6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
6 Armored Recon Battalions = 12 IBPs, complete in October 1927
2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


Total Cost: 102 IBPs


Navy

1 Eagle-class (12,933t) = 12.9 IBPs (construction phase complete April 1927, completion in October 1927)
1 Eagle-class (12,933t) = .7 IBPs (construction complete, completion in October 1927)
10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
4 2 Defiant-class (55,000t) = 110 IBPs (construction phase complete April/July 1927, full completion in March-July 1928)
2 Defiant-class (55,000t) = 5.5 IBPs (construction complete, full completion in April 1928)
2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete April 1929, full completion in October 1930)
5 Seattle-class (10,600t) = 53 IBPs (construction phase complete July 1928, full completion in April 1929)

Total Cost: 328.9 IBPs


Air Force

20 1924-model transport aircraft = 10 IBPs (completion April 1927)
5 1926-model fighter aircraft = 5 IBPs (completion July 1927)

Total Cost: 5 BPs

Overall Expenditures: 565.9/566.5 IBPs


Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: July 1926
Complete: July 1928

Slot 3: Light Tank with Suspension System
Started: July 1926
Complete: July 1927

Re: SDN World 3 Construction Queue Thread

Posted: 2010-03-30 08:19pm
by RogueIce
United States of America - Q2 FY1927 (April)

Total: 550 IBPs (5 IND/5 ECON)

National Projects
Upgrade Industrial Capacity: 100
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Upgrade 40-55kt Slipway to 55-70kt Slipway: 15 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 40-55kt Slipway: 20 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)
Build 55kt-70kt Slipway: 25 (Complete OCT 1927)

United States Navy
Fitting out South Dakota class BB (43200t): 2.16 (Fitting out complete JAN 1928)
Fitting out South Dakota class BB (43200t): 2.16 (Fitting out complete JAN 1928)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Refit South Dakota class BB with superheavy 16" shells: 32 (Refit complete OCT 1927)
Fitting out Lexington class CV (36000t): 0.9 (Fitting out complete JAN 1928)
Fitting out Lexington class CV (36000t): 0.9 (Fitting out complete JAN 1928)
Fitting out 4x Tampa CA (24610t): 98.4 4.92 (Construction complete APR 1927; Fitting out complete JAN 1928)
Building 8x Toronto CL (9636t): 76.8 (construction complete JUL 1927; Fitting out complete JAN 1928)
Fitting out 8x Farragut DD {Fubuki type} (1800t): 14.4 0.72 (Construction complete APR 1927; Fitting out complete JUL 1927)
Building 10x Farragut DD {Fubuki type} (1800t): 18 (Construction complete JAN 1928; Fitting out complete APR 1928)
40 FB [Boeing Model 15]: 4 (Complete APR 1927)
30 SC [Curtiss CS]: 3 (Complete APR 1927)
40 FB [Boeing Model 15]: 4 (Complete JUL 1927)
40 SC [Curtiss CS]: 4 (Complete JUL 1927)
20 TD [Douglas C-1]: 10 (Complete JUL 1927)

United States Army
Forming 1 Armor Brigade: 10 (Complete OCT 1927)
Forming 2 Infantry Brigades w/vehicular transport: 6 (Complete OCT 1927)
Forming 1 Siege Artillery Brigade: 5 (Complete OCT 1927)
Converting 13th Division (Reserve) to active duty: 1 (Effective APR 1927)
Converting 4th Cavalry Division (Reserve) to active duty: 2 (Effective APR 1927)
Upgrading 1st Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading 4th Division to Motorized Infantry: 9 (Complete JAN 1928)
Upgrading Artillery Brigade (attached I Corps) to Motorized Towed Artillery: 6 (Complete JAN 1928)
Forming 4 Armored Recon Battalions: 8 (Complete JAN 1928)

United States Army Air Corps
40 P-5 [Boeing Model 15]: 4 (Complete APR 1927)
20 A-2 [Curtiss Falcon]: 2 (Complete APR 1927)
10 O-2 [Curtiss Falcon]: 1 (Complete APR 1927)
40 C-1 [Douglas C-1]: 20 (Complete APR 1927)
30 P-5 [Boeing Model 15]: 3 (Complete JUL 1927)
10 A-2 [Curtiss Falcon]: 1 (Complete JUL 1927)
20 O-2 [Curtiss Falcon]: 2 (Complete JUL 1927)

TOTAL: 531.56 / 550

Research

Slot 1: Amphibious Landing Boat Designs
Started: October 1925
Complete: October 1928

Slot 2: Superheavy Naval Shells (16" and 18" calibers)
Started: October 1925
Complete: October 1927

Slot 3: Light Tank with Suspension System
Started: October 1926
Complete: October 1927

Re: SDN World 3 Construction Queue Thread

Posted: 2010-04-07 02:46pm
by Raesene
Tuscan Kingdom, Q1 1927:

Infrastructure: 20 General improvements to railways, harbours, roads etc
Economy: 20 focus on promoting Tuscan products in Europe and abroad
total 40pts; same amount spent since game start

Mesoamerican Canal Project 20 pts
Research Projects
long range/ high endurance planes (Farreacher; First flight 1928)
Improve agrochemistry (fertilisers, pesticides, seed quality etc.)
naval ordnance

towards Air focus 3: 20
towards Army focus 4: 20
total 40pts; same amount spent since game start

Navy
type |# building |pts/ship |pts/class |Q in construction/ of total time
CV |1x Pegaso |25 |25 |quarter 4/8 | intermediate between Ark Royal and Courageous – 60 aircraft; under construction
DD |12x Artigleri | 3 | 36 quarter 1/4 | repeat Alkalini DDs; under construction
DL |12x Diamante | 4.5 | 54 quarter 1/4 | Diamante-class (very) large destroyers/small cruisers; under construction

DD |12x Nonmetalli e Semimetalli | 4 | 1.8 quarter 4/4 | repeat Alkalini DDs; trials
BB |1x Patria |50 | 2.5 |Quarter 9/12 | Patria-class fitting out
BB |1x Africa |50 | 2.5 |Quarter 9/12| Patria-class fitting out

BB |1x Tasmania |50 | 50 |Quarter 8/12 |Patria-class under construction
CA |1x Mamberamo |17 | 0.85 |quarter 8/8 | Tevere-class, trials
CA |1x Mosca |17 | 0.85 |quarter 8/8 | Tevere-class, trials
CV |1x Cigno | as HMS Courageous; finished
CV |1x Albatro |as HMS Courageous; finished
Colonial Sloops/Gunboats/Monitors
SL 10x Flora-class finished


MAS:
50 for Tuscany (150 ts each, 7.5 pts), under construction

60 MAS (30ts each) for Germany (1.8 pts, 2 pts payment-> +0.2pts; vessels to be delivered April 1927)

completed in previous quarter: 100 for Tuscany (150 ts each)

Expansion of three 25-40kt slip to 55-70kt slips;
3x 2.5 IP/Quarter, finished End of Q2/1927
two of the slips to be extended are in Livorno, the other in Tasmania.

Aircraft

Series production:
25 pts for the acquisition of license-built Hawker Horsley bombers (12 Squadrons)
10 Squadrons of Dart bombers 20 pts
18 Squadrons of Flycatcher fighters 18 pts

Army
30 pts: Upgrade of 10 Army brigades to brigades with vehicular transport (Q 3/4)
40 points to improve coastal defenses (construct bunkers, etc.)

420.2 points spent in total for Q1/1927

Re: SDN World 3 Construction Queue Thread

Posted: 2010-04-07 03:04pm
by Thanas
German Empire Q2 1927:
Base point Germany: 480 *1.10 = 528
Base point Dutch territories 400 *1.05 = 420
= 948

Shipyards: - 80
- 50 for construction of 2 new 55-70 kt yards (complete Q2 1927)
- 30 for upgrade of 2 55kt yards to 55-70kt yards (complete Q2 1927)

Investments: - 159
- 20 for canal project
- infrastructure upgrade Dutch: 62,5 (total invested 250/500)
- economy upgrade dutch territories: 62,5 (total invested 250/500)
- 14 for Rhein Donau canal

Army: 0

Navy: - 669.8
- 1,8 for fitting out CV conversion (complete Q4 1927)
- 11 for fitting out new ships (2 Imperator BB, 2 Scharnhorst class BC) (complete Q2 1928)
- 15 for liner to design of RMS Aquitania (45kt liner) (launch Q2 1927, finished Q3 1928)
- 14 for liner to design of SS Ile de France (43kt liner) (launch Q2 1927, finished Q3 1928)
- 4 for fitting out of 4 Heavy cruisers (finished Q3 1927)
- 55 for 1 Scharnhorst class BC (launch Q2 1928)
- 3 for fitting out of 6 Hamburg class light cruisers (finished Q3 1927)
- 90 for 9 Utrecht class light cruisers (launch Q1 1928, ready Q3 1928)
- 128 for refitting 3 L20alpha and 4 Einheit class BB (ready Q2 1927)
- 130 for 2 65kt BC (launch Q4 1928)
- 120 for 2 60kt BB (launch Q1 1929)
- 52 for 3 Bremen class liners (launch Q1 1929, ready Q2 1930)
- 25 for 1 25kt Aircraft carrier (launch Q2 1928)
- 21 for 6 Rapidkreuzer (3,5kt each) (launch Q4 1927)

Naval Air Arm: - 25,2

- 7,2 for 72 Dornier Do-H
- 18 for 180 torpedo bombers


Air force: -16

- 15 for second payment to Balkan Confederacy
- 1 for 20 Transport planes

Others: +2
+12 from sale of ships to the USA
- 5 for SPG technology from the Dominion (1/3 payments)
- 5 for Paratrooper technology from the Egyptian Sultanate (1/3)

left: 0


Completed at end of this quarter:
- 20 Transport planes
- 72 Dornier Do-H
- 180 torpedo bombers
- 2 new 55-70 kt yards
- Upgrade of 2 55kt yards to 55-70kt yards
- refit of 3 L20alpha and 4 Einheit class BB

Ships launched:
- liner to design of RMS Aquitania
- liner to design of SS Ille de France

Re: SDN World 3 Construction Queue Thread

Posted: 2010-04-16 09:19pm
by CmdrWilkens
The game may be "dead" but damnit I'm building the Nicaraguan Canal....

Industrial Projects of the Mexican Empire

Industry Level: 5 (+10 pts investment, +5% Econ=4)
535.5 pts available
526.8 In Use


Q3 1927 Current Projects

Army: (168)
  • Upgrades: (48)
    • Sixteen (16) Brigades upgrade to Motor Transport (3 pts) [Started Q2 1927 Complete Q1 1928]
      One (1) Brigade upgraded to Armored Bde (see below) (2 pts) [Started Q2 1927 Complete Q1 1928]
    Acquisitions: (120)
    • Brigade acceptance testing New Model (1927 Medium and 1925 Light Tank) (10 pts) [Started Q1 1927, Complete Q4 1927]
      Eleven Brigades upgrade to New Model (10 pts) [Started Q3 1927, Complete Q2 1928, Fully effective Q1 1929]

Navy: (117.8)
  • Slipways: ()
      Acquisitions: (117.8)
      • Two (2) Hispaniola class Aircraft Carriers: 48.8 pts [(2 ships at 24.4 kt with 1pt/1 kt) (Started Q2 1927, Complete Q2 1928, Trials Q1 1929)]
        Four (4) Majestuoso class Battlecruisers: 11pts [(4 ships at 55 kt with .05pt/1 kt) (Started Q1 1925, Complete Q4 1926, Trials Q4 1927)]
        Twenty (20) S-class Mk IV Submarines: 24pts [(20 ships at 1.2kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]
        Twenty (20) Rio Grande-class Destroyers: 34pts [(20 ships at 1.7kt with 1pt/kt) (Started Q1 1927, Complete Q3 1927, Trials Q4 1927)]

    Air Force: (66)
    • Aquisitions: (16)
      • 160 Attack fighters (2 wings) DH.10 16pts [(160 planes at 1pt/10) (Started Q3 1927, Complete Q3 1927)]
      Technology: (50)
      • Air Tech 3 to Air Tech 4 [(50pts/qtr for 4 qtrs, 0pts/qtr for 4 quarters) (Started Q1 1927, Complete Q4 1928)]

    Other: (175)
    • Industrial Capacity Increase: 80pts (Started Q1 1927, Round 3 Complete Q4 1927)
      Infrastructure Improvements (Inf 4 to Inf 5): 45pts (Started Q1 1927, Complete Q4 1929)
      Nicaraguan Canal: 50 pts (Started Q1 1925, Complete Q4 1932)

    ============================================================
    Completed Items
    As items are completed they will be moved here for archiving in the quarter in which they were fully finished (that is all IBP usage ceased)

    =======================
    Q1 1925:
    • 80 Fighters (1 wing) PW-6 8pts (Started Q1 1925, Complete Q1 1925)
      80 Attack fighters (1 wing DH.10 8pts (Started Q1 1925, Complete Q1 1925)
    =======================
    Q2 1925:
    • 80 Fighters (1 wing) PW-6 8pts (Started Q2 1925, Complete Q2 1925)
      80 Attack fighters (1 wing DH.10 8pts (Started Q2 1925, Complete Q2 1925)
    =======================
    Q3 1925:
    • IV Corps Motorization: 21pts (7 Brigades transferring Rifle to Motor-Rifle, Started: Q1 1925 Complete: Q3 1925)
      III Corps Motorization: 27pts (3 Divisions transferring Rifle to Motor-Rifle, Started Q1 1925 Complete: Q3 1925)
      160 Fighters (2 wings) PW-6 16pts (Started Q3 1925, Complete Q3 1925)
      One hundred sixty (160) PW-6 Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
      One Hundred Twenty (120) DH.10 Attack Fighters (1pt per 10) (Started Q3 1925, Complete Q3 1925)
    =======================
    Q4 1925:
    • Permanent activation of 20 Artillery Bdes from Reserves [Corps Artillery Brigades from 1st rate Reserve Corps will upgrade to active status but be re-assigned to their reserve corps upon mobilization.
      7 Divs worth at 2pts/ division (14) [Started Q3 1925, Complete Q4 1925]
      80 Fighters (1 wing) PW-6 8pts (Started Q4 1925, Complete Q4 1925)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q4 1925, Complete Q4 1925)
    =======================
    Q1 1926:
    • VII Corps Motorization: 18pts (6 Brigades transferring Rifle to Motor-Rifle, Started Q3 1925 Complete Q1 1926)
      80 Recon Planes (1 wing) C-1 8pts (Started Q1 1926, Complete Q1 1926)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q1 1926, Complete Q1 1926)
      Thirty-three (33) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1925, Complete Q1 1926]
    =======================
    Q2 1926:
    • Six (6) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q4 1925, Complete Q2 1926]
      80 Fighters (1 wing) PW-6 8pts (Started Q2 1926, Complete Q2 1926)
      80 Attack fighters (1 wing) DH.10 8pts (Started Q2 1926, Complete Q2 1926)
      Forty (40) Rio Turias-class Frigates [(40 ships at .9kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Sixteen (16) Rio Grande-class Destroyers [(10 ships at 1.7kt with 1pt/kt) (Started Q3 1925, Complete Q1 1926, Trials Q2 1926)]
      Industrial Capacity Increase: 20pts (Started Q3 1925, Round 1 Complete Q2 1926)
    =======================
    Q3 1926:
    • Acceptance testing on PW-9 Fighter [(10 planes at 1pt/plane) (Started Q3 1926, Complete Q3 1926)]
    =======================
    Q4 1926:
    • Two (2) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q2 1926, Complete Q4 1926]
      Two (2) New 40-55kt slips: 40pts [2 @ 20pts each (Started Q1 1925, Complete Q4 1926)]
      Two (2) New 55-70kt slips: 50pts [2 @ 25pts each (Started Q1 1925, Complete Q4 1926)]
      Eight (8) San Juan-class Cruisers [(8 ships at 9.4kt with .05pt/kt) (Started Q3 1925, Complete Q2 1926, Trials Q4 1926)]
      Acceptance testing on HP.24 Attack Fighters [(10 planes at 1pt/plane) (Started Q4 1926, Complete Q4 1926)]
    =======================
    Q1 1927:
    • Eight (8) Infantry Division upgrade to Motor-Transport (9 pts) [Started Q3 1926, Complete Q1 1927]
      400 Fighters (5 wings) PW-9 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      400 Attack Fighters (5 wings) HP.24 (40 pts) [(400 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
      Eighty Reconnaissance Planes (1 wing) C-1 (8 pts) [(80 planes at 1pt/10) (Started Q1 1927, Complete Q1 1927)]
    =======================
    Q2 1927:
    • 160 Fighters (2 wings) PW.9 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      160 Attack Fighters (2 wings) HP.24 (16 pts) [(160 planes at 1pt/10) (Started Q2 1927, Complete Q2 1927)]
      20 Transport Planes (1 Squadron plus fill out) T.11 (10 pts) [(20 planes at 1pt/2) )Started Q2 1927 Complete Q2 1927)]
      Acceptance testing on TBN.1 Torpedo Plane [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Acceptance testing on FN.1 Naval Fighter [(10 planes at 1pt/plane) (Started Q2 1927 Complete Q3 1927)]
      Two (2) Upgraded 55-70kt slips: 40pts [2 @ 20pts each (from 25-40kt, Started Q3 1925, Complete Q2 1927)]
      Industrial Capacity Increase: 20pts (Started Q3 1926, Round 2 Complete Q2 1927)

    Re: SDN World 3 Construction Queue Thread

    Posted: 2010-04-20 09:46am
    by Thanas
    Construction Queue for Nordic Union NPC:
    Population: 3
    Home Territory: 4 (Norway, Sweden, Denmark, Gotland, Aland, Bornholm)
    Colonial Territory: 3 (Iceland, Svalbardia, the Faroe Islands, Labrador, Greenland*)
    Industry: 5
    Economy: 4
    Infrastructure: 4
    SML: 3
    Naval Focus: 4
    Army Focus: 0+3 ( bonus from Industry)
    Air Focus: 1
    525 IBPS
    Population: 75,000,000 (70M in Denmark/Norway/Sweden, 1.4M in Iceland, 3.5M in Vinland/Markland, about 50K apiece in Svalbard and Greenland)
    Mobilization Pool: 12,000,000 (Infrastructure 4 + Economy 4 = 16%)


    Q1 1925:

    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

    Army - 290ibp
    Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

    Air Force - 65ibp
    260 Boeing FB - 26pts (completing Q2 1925)
    120 Boeing DT - 24pts (completing Q2 1925)
    3 Zeppelins - 15pts (completing Q3 1925)

    left: 0



    Q2 1925:
    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)

    Army - 290ibp
    Activating 40 reserve infantry divisions - 40ibp (completing Q3 1925)
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)

    Air Force - 65ibp
    260 Boeing FB - 26pts (completing Q3 1925)*
    120 Boeing DT - 24pts (completing Q3 1925)*
    3 Zeppelins - 15pts (completing Q3 1925)


    left: 0



    Q3 1925

    Navy - 170ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    16x S-class submarine - 16ibp (1kt*10=16kt) (launching Q3 1925, commissioning Q4 1925)


    Army - 330ibp
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 cavalry divisions w/ flying artillery - 40ibp (completing Q3 1925)
    Raising 40 infantry divisions - 80 IBP (complete Q1 1926)

    Air Force - 25 Ibp
    25 for 250 Boeing FB (1 month)


    left: 0


    Q4 1925

    Navy - 154,9 ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    Trials for 16x S-class submarine - 0,9 ibp (commissioning Q4 1925)

    Army - 290ibp
    Raising 30 motorized infantry brigades - 90ibp (completing Q1 1926)
    Raising 20 horse artillery brigades - 60ibp (completing Q1 1926)
    Raising 10 motor artillery brigades - 60ibp (completing Q1 1926)
    Raising 40 infantry divisions - 80 IBP (complete Q1 1926)
    Raising 28 infantry divisions - 56 IBP (complete Q2 1926)

    Airforce:
    24 for 240 Boeing DT


    left: 0,1



    Q1 1926

    525 points

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 154ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)

    Army: - 56 ibp
    Raising 28 infantry divisions - 56 IBP (complete Q2 1926)

    Air force:
    15 for 150 Boeing DT


    left: 0




    Q2 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)

    Navy - 154ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - 40ibp (10kt*4=40kt) (launching Q2 1926, commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)

    left: 11

    Air force:
    11 for 110 Boeing FB



    Q3 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)



    Navy - 225 ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - trials - 2ibp (commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)


    left: 0






    Q4 1926

    525 points


    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1926)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 116ibp
    1x Frederik VII-class superdreadnought - 48ibp (48kt*1=48kt) (launching Q1 1927, commissioning Q1 1928)
    2x Revenge II-class dreadnought - 66ibp (33kt*2=66kt) (launching Q1 1927, commissioning Q1 1928)
    4x Hawkins-class heavy cruiser - trials - 2ibp (commissioning Q1 1927)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)

    left: 0



    Q1 1927

    550 points

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1927)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)


    Navy - 250
    1x Frederik VII-class superdreadnought - 2,4ibp - trials - (commissioning Q1 1928)
    2x Revenge II-class dreadnought - 3,3ib - trials (commissioning Q1 1928)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    49 for 44 V+W class destroyers (launching Q1 1927, commissioning Q2 1927)
    4x Hawkins-class heavy cruiser (40 IBP, launching Q1 1928, commissioning Q3 1928)
    2 Frederik VII class superdreadnoughts (launch Q1 1929, commissioning Q1 1930)


    Air force: 0

    left: 0




    Q2 1927


    550 points

    Navy - 150
    1x Frederik VII-class superdreadnought - 2,4ibp - trials - (commissioning Q1 1928)
    2x Revenge II-class dreadnought - 3,3ib - trials (commissioning Q1 1928)
    3 Courageous-class aircraft carriers - 60 IBP (launching Q2 1927, commissioning Q1 1928)
    44 V+W class destroyers - trials - 2,5, commissioning Q3 1927
    2 Frederik VII class superdreadnoughts (launch Q1 1929, commissioning Q1 1930)
    4x Hawkins-class heavy cruiser (40 IBP, launching Q1 1928, commissioning Q3 1928)

    Investments: 300
    upgrading 1 40-55kt yard to 70kt: 15 IBP (finished Q4 1927)
    upgrading 3 25-40kt yards to 70kt: 60 IBP (finished Q4 1927)
    Industry improvement: 100 points (finished Q4 1927)
    Infrastructure improvement: 62,5 (finished Q4 1927)
    Economy improvement: 62,5 (finished Q4 1927)

    Army:
    Raising 20 horse artillery brigades - 60 IBP, completing Q2 1928
    Raising 20 infantry divisions - 40 IBP, completing Q3 1927

    Air force:
    0,8 for 8 Boeing FB

    0 left



    Units Completed:

    888 Boeing FB
    630 Boeing DT
    3 Zeppelins
    10 cavalry divisions w/ flying artillery
    40 infantry divisions from reserve to active
    68 infantry divisions
    30 motorized infantry brigades
    20 horse artillery brigades
    10 motor artillery brigades
    4 Hawkins-class heavy cruiser
    16x S-class submarine

    Units fitting out/in trials:

    1x Frederik VII-class superdreadnought
    2x Revenge II-class dreadnought
    44 V+W class destroyers

    Re: SDN World 3 Construction Queue Thread

    Posted: 2010-04-20 10:37am
    by Steve
    Q3 1927 Construction Queue

    Total IBPs: 515 (5 Industry) + 10% (5 Economy) = 566.5

    National Projects:

    Air Tech 4 = 20 IBPs, 200/200, started January 1925, minimum completion January 1927 (Completed July 1927)
    Infrastructure Upgrades = 75 IBPs, 375/500, started January 1925
    Nicaragua Canal Project = 20 IBPs

    Total Cost: 95 IBPs


    Army

    6 Motorized Infantry Divisions = 54 IBPs, complete in October 1927, max effectiveness in October 1928
    2 Motorized Artillery Brigades = 12 IBPs, complete in October 1927, max effectiveness in October 1928
    6 Armored Recon Battalions = 12 IBPs, complete in October 1927
    2 Artillery Brigades = 6 IBPs, complete in July 1927, max effectiveness in July 1928
    2 Motorized Infantry Brigades = 6 IBPs, complete in January 1928, max effectiveness in January 1929
    1 Armored Brigade = 9 IBPs, complete in January 1928, max effectiveness in January 1929
    1 Armored Recon Battalion = 2 IBPs, complete in January 1928, max effectiveness in January 1929
    Activating 3 Infantry Divisions from Reserve = 3 IBPs, complete in July 1927


    Total Cost: 93 IBPs


    Navy

    1 Eagle-class (12,933t) = .7 IBPs (construction complete, completion in October 1927)
    10 Horton-class (1,800t) = 18 IBPs (construction phase complete October 1927, completion in January 1928)
    2 Defiant-class (55,000t) = 110 IBPs (construction phase complete April/July 1927, full completion in March-July 1928)
    2 4 Defiant-class (55,000t) = 11 IBPs (construction complete, full completion in April 1928)
    2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete April 1929, full completion in October 1930)
    2 Excalibur-class (64,400t) = 128.8 IBPs (construction phase complete July 1929, full completion in January 1931)
    5 Seattle-class (10,600t) = 53 IBPs (construction phase complete July 1928, full completion in April 1929)
    2 Seattle-class (10,600t) = 21.2 IBPs (construction phase complete October 1928, full completion in July 1929)

    Total Cost: 361.5 IBPs


    Air Force

    5 1926-model fighter aircraft = 5 IBPs (completion July 1927)
    60 1925-model fighter/bomber carrier aircraft = 6 IBPs (completion October 1927)
    20 1925-model B-4 heavy bomber aircraft = 10 IBPs (completion October 1927)

    Total Cost: 16 IBPs

    Overall Expenditures: 565.5/566.5 IBPs


    Research

    Slot 1: Amphibious Landing Boat Designs
    Started: October 1925
    Complete: October 1928

    Slot 2: Superheavy Naval Shells (16" and 18" calibers)
    Started: July 1926
    Complete: July 1928

    Slot 3: Light Tank with Suspension System (Complete!)
    Started: July 1926
    Complete: July 1927

    Slot 3: Automatic Infantry Weapon Studies
    Started: July 1927
    Complete: July 1930

    Re: SDN World 3 Construction Queue Thread

    Posted: 2010-04-20 11:05am
    by Thanas
    Build queue for NPC China:
    Population: 5
    Territory: 5
    Colonies: 0
    Industry: 4
    Economy: 3
    Infastructure: 4
    Starting Military Limit: 2
    Naval Focus: 3
    Army Focus: 5 (3+2)
    Air Focus: 3
    IBP total: 410



    Q1 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (20/200)
    Infrastructure: 10 (10/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)


    Total: 410



    Q2 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (40/200)
    Infrastructure: 10 (20/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410




    Q3 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (60/200)
    Infrastructure: 10 (30/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410



    Q4 1925:
    Total IBP: 410

    Investments: 90
    Industry: 20
    Air Tech 4: 20 (80/200)
    Infrastructure: 10 (40/500)

    Navy:
    - 275 for 4 BC's and 2 BB's (2 years)

    Army:
    - 57 for 5 divisions to be motarized (1 year)
    - 10 for 5 Armored Recon Battllions (1 year)

    Air force:
    - 8 for 80 Fighters (1 month)

    Total: 410



    Q1-4 1926:
    Total: 415

    Navy:
    240 for 4 BC and 2 BB (launch Q1 1927, ready Q1 1928)


    Investments:
    Air Tech 4: 30
    Infrastructure: 115
    Industry: 20

    Air Force: 10 for 100 fighters


    Q1 1927:

    Total: 420

    Navy:
    12 for fitting out of 4 BCs and 2 BBs
    106.8 for 60 Fubuki-class analogues (launch Q3 1927, commissioned Q4 1927)

    Investments:
    Industry: 100
    Economy: 50 for Economy 4 (ready Q1 1929)

    Army:
    150 for 75 infantry divisions (ready Q3 1928)

    Air Force:
    1,2 for 12 fighters.

    0 left


    Q2 1927:

    Total: 420

    Navy:
    12 for fitting out of 4 BCs and 2 BBs
    106.8 for 60 Fubuki-class analogues (launch Q3 1927, commissioned Q4 1927)

    Investments:
    Industry: 100
    Economy: 50 for Economy 4 (ready Q1 1929)

    Army:
    150 for 75 infantry divisions (ready Q3 1928)

    Air Force:
    1,2 for 12 fighters.

    0 left

    Completed units:
    412 fighters
    5 armored recon bataillons
    motorization of 5 divisions
    Infrastructure level of 5
    Air tech 4



    NPC Portugal
    Population: 2 (4 with boost from colonies)
    -100 million citizens
    Territory: 1
    Colonies: 4
    Industry: 5
    Economy: 4
    Infrastructure: 3
    Standing Military Limit: 3
    Naval Focus: 2 (5 with boost from Industry)
    Army Focus: 3
    Air Focus: 3

    Manpower pool: 14 million
    4,2 million soldiers
    0,84 active solders
    3,36 reserve soldiers
    Q1 1926:
    525 points to spend

    Investments:
    Economy: 105 points (econ 4 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 23.2 for 1 23.2kt Cidade-class Battleships, launch Q2 1926, ready Q4 1926
    - 2,5 for trials of 20 2,5kt cruiser submarines (ready Q2 1926)

    Army:
    - 20 for 4 siege artillery brigades
    left: 0


    Q2 1926:

    525 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 23.2 for 1 23.2kt Cidade-class Battleships, launch Q2 1926, ready Q4 1926

    Army:
    - 20 for 4 siege artillery brigades

    left: 0

    Q3 1926:
    525 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)

    Army:
    - 20 for 4 siege artillery brigades

    left: 0


    Q4 1926:
    550 points to spend

    Investments:
    Economy: 105 points (econ 5 finished Q4 1926)
    Industry: 100 points
    Infrastructure: 50 points (finished Q4 1927)

    Navy:
    - 100 for 2 50kt Gigante-class Dreadnoughts (finish Q4 1926, ready Q1 1928)
    - 105.2 for 4 26.3kt Intervenção-class BB, Launch Q4 1926, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)

    Army:
    - 20 for 4 siege artillery brigades

    left: 0


    Q1 1927:
    577.5 points to spend

    Investments: 292.5
    Industry: 100 points
    Infrastructure: 62,5 points (infrastructure 5 finished Q4 1928)
    50 for 2 new 70kt slipways (ready Q1 1929)
    80 for upgrading 4 25-40kt to 70kt slipways

    Navy: 145,9
    - 5 for trials of 2 50kt Gigante-class Dreadnoughts (ready Q1 1928)
    - 5,3 for trials of 4 26.3kt Intervenção-class BB, ready Q1 1928
    - 35,6 for 20 Fubuki-class analogues (launch Q1 1927, ready Q2 1927)
    - 100 for 2 50kt Gigante-class Dreadnoughts (launch Q4 1928, ready Q1 1929)

    Army:
    60 for 30 new infantry divisions (ready Q3 1927)

    Air force:
    48 for 480 fighters
    31,1 for 311 torpedo bombers

    left: 0


    Q2 1927:
    577.5 points to spend

    Investments: 292.5
    Industry: 100 points
    Infrastructure: 62,5 points (infrastructure 5 finished Q4 1928)
    50 for 2 new 70kt slipways (ready Q1 1929)
    80 for upgrading 4 25-40kt to 70kt slipways (ready Q1 1929)

    Navy: 112.1
    - 5 for trials of 2 50kt Gigante-class Dreadnoughts (ready Q1 1928)
    - 5,3 for trials of 4 26.3kt Intervenção-class BB, ready Q1 1928
    - 1.8 for 20 Fubuki-class analogues (ready Q3 1927)
    - 100 for 2 50kt Gigante-class Dreadnoughts (launch Q4 1928, ready Q1 1929)

    Army:
    60 for 30 new infantry divisions (ready Q3 1927)


    Air force:
    60 for 600 fighters
    52,9 for 529 light bombers

    left: 0

    Completed units (Q3 1927):
    4 Siege artillery brigades
    1080 fighters
    311 torpedo bombers
    529 light bombers
    20 Fubuki-class analogues
    30 infantry divisions


    New manpower at end of Q2 1927: 18 million (due to raising of econ to 5)
    active soldiers: 1,31 million
    reserve: 3,36 million
    Manpower pool left: 13,33 million