Page 4 of 5
Re: Stargate Command Croydon
Posted: 2016-08-28 04:21pm
by Starglider
Alas madness has set in; a very specific kind of madness, not uncommon on the AVS forums: rear projection optical path optimisation. First, I thought why not have a ratio of 2.4:1 instead of 16:9, not just for films, but also for PC gaming. Ok, some more throw length required to cover the width so two mirrors instead of one, in fact the more the better so let's extend beyond the deepest viable wall position with some concrete pipe segments (waterproofing be damned);
Ah, but the brightest non-professional 4K projector you can get is only 2000 lumens and that is only a brightness of 20 nits. But what about using a 1.5 optical gain screen? Well, incidence angle must be below 13 degrees to achieve an acceptable center to corner screen brightness ratio. This requires an optical path length of 9.5m. At this point I realised that technically, no could stop me from just excavating a huge trench under the experiment chamber.
9.5m is coincidentally the maximum throw distance for the Sony VPL-VW1100ES in 16:9 mode, so that works out nicely. Obviously this would also be useful as somewhere to put the pulse forming network when it comes to installing the teleporter.
Re: Stargate Command Croydon
Posted: 2016-08-31 04:37pm
by Starglider
The wife is expressing some skepticism about the need for five separate projectors (and that's just 2D content). But then, she still hasn't seen Wargames yet. I'm sure a film evening can convince her of the necessity of a Big Board in every War Room.
Re: Stargate Command Croydon
Posted: 2016-10-27 06:55pm
by Starglider
This has taken a hideously long time mostly due to the astounding, yet wholly unsurprising, inefficiency of local government beurecracy. However structural design is finally complete: the engineer deleted all the steels except the hoist beams, repalcing them with integrated R/C, and switched all the steel mesh to individual rods.
The 3D view really makes it clear that the overall size is bigger than the main house, and indeed, the average detached house here. Because of course MAD SCIENCE is more important than mere living accomodations. The next step is temporary piling; I am collecting quotes now.
Re: Stargate Command Croydon
Posted: 2017-01-28 09:41am
by Starglider
Construction of the upper pile wall was prioritised due to the fact that the 1950s mortared stone retaining wall bellow the house had buckled, and was risking subsidence of the house. Spec is 14 x 450mm piles with R/C capping beam, 5 x 25mm rebar cages in each. Drilling was delayed for days by mysterious and inexplicable faults in the piling rig. Finally, as the last bore of the first pass reached 11 metres below ground (this type of pile wall is done in two passes), a screeching and wailing noise errupted from the hole. The crew were visibly concerned but pushed on. At 12 metres the drill string snapped, leaving 4 metres of auger stuck in the hole. The crew worked through Saturday to force backfill into the shaft, recover the buried drill components and then re-bore the hole ready for concrete pouring.
This type of auger is extremely sturdy and the strata is relatively soft chalk; cause of the failure remains undetermined.
Re: Stargate Command Croydon
Posted: 2017-01-28 10:29pm
by madd0ct0r
Ugh. Screeching and wailing is steel on steel in my experience. Once welded the tip of a core drill to some rebar by trying to push past it.
Could have been an unusually large flint inclusion. Could have been an old waste tip . Purely in a detached professional capacity, because I don't know where you are in relation to London and its old airfields, was the risk of UXOs ever discussed?
Re: Stargate Command Croydon
Posted: 2017-01-29 12:19pm
by Starglider
madd0ct0r wrote:Could have been an unusually large flint inclusion. Could have been an old waste tip . Purely in a detached professional capacity, because I don't know where you are in relation to London and its old airfields, was the risk of UXOs ever discussed?
The site is 1.5km from RAF Kenley, which was one of the three main fighter airfields defending London in the second world war. All UXO was thoroughly cleared postwar though.
Re: Stargate Command Croydon
Posted: 2017-03-20 04:09pm
by Starglider
COMMENCE PRIMARY EXCAVATION
A mere 17 months elapsed from concept drawings to actual construction, thanks to the speed and efficiency of local government beurecracy. Of course drainage and air supply requires a series of tubes.
Re: Stargate Command Croydon
Posted: 2017-04-11 05:43pm
by Starglider
This small excavator was lifted down into the hole by the large excavator: about to dig out the sump pit and projection trench.
Re: Stargate Command Croydon
Posted: 2017-04-12 06:21pm
by SCRawl
Is the portable toilet from the previous post larger on the inside?
Re: Stargate Command Croydon
Posted: 2017-04-21 07:54pm
by The_Saint
If it isn't I'm sure the police call box in the background is...
Re: Stargate Command Croydon
Posted: 2017-07-31 06:10pm
by Starglider
Internet connectivity has been down for four months now, excepting 4G wireless which has a tragically low (20GB) cap. Progress was slowed by the groundwork contractor walking off the job (apparently ceased trading). I'm now organising labour and plant myself on day rates / weekly hire.
We are about to pour concrete for the optical trench. I changed the outer formwork for the lower walls from temporary aluminium system to 140mm concrete blockwork (left in place), to act as retaining walls to appease building control inspectors and to avoid the sheer hassle of renting the stuff, setting it up and worst of all getting it back out again. Also adds some strength to the walls and avoids having to use angle iron to support the upper brickwork form wall.
The sump floor and walls were done with on-site mixed concrete; the full cube form is waiting to be buried under the floor slab. Crazed beurecrats at the council demanded a radon/methane proof gas membrane on top of the DPC membrane even though the former is also completely waterproof. I took the opportunity to sandwich an additional conductive foil layer inbetween for enhanced screening. That will now be two dedicated foil layers, one encapsulated layer and two insulation bonded layers on the floor slab. I've also changed the inner formwork for all the walls and roof slabs to galvanised corrugated steel roofing sheets (also left in place, with lots of through bolts for concrete bonding). It's actually cheaper than using plywood or hiring/setting up/removing temporary aluminium formwork and (when thoroughly multi-point grounded) is an effective EM screen, plus it provides backup waterproofing. Of course it will require substantial temporary bracing.
The structural engineer specified 5m ish rebar lengths with lots of overlaps and ties but I don't see the point. I intend to use full span single pieces of rebar (8 to 12m) for the suspended slabs. We'll need a mobile crane to get the bundles from an articulated HGV on the road to the staging area, but I'll probably make up the cost on the reduced labour and it will be stronger. For the lower slab the sheer stress is negligible (¬200m of solid chalk down to the sandstone bedrock, it's not going to shift significantly) so I'm using heavily lapped fabric mesh with extra bar around the corners and edges.
So far I've done all the onsite carpentry and a bit of general labouring shifting spoil around and sealing/cleaning things up. To date specifically for this job I've acquired an impact driver, a petrol concrete vibrator, a heavy duty hammer drill (my standard mains drill died), two 3m scaffold towers (mainly to support my half-tonne power winch), 25 1-tonne traffic barriers (plus assorted pedestrian barriers), a 16mm electro-hydralic 'portable' rebar bender (which weighs 30kg and looks like a power armour close combat weapon), an automatic rebar tying gun and 50 used 2 tonne props (I already had a variety of angle grinders). Largely because the cost of hiring most of this stuff is about three weeks == new purchase price, 2 weeks == second hand purchase price, so might as well just buy it.
Re: Stargate Command Croydon
Posted: 2017-08-01 11:18am
by Beowulf
Check with the structural engineer about changes. Sometimes changes don't seem like they could be an issue, until your suspended walkway falls down because someone changed the design. I suspect that the single length may be more prone to breaking under tension. Or it may just be for easy construction.
Re: Stargate Command Croydon
Posted: 2017-08-06 07:59pm
by Starglider
Re: Stargate Command Croydon
Posted: 2017-08-26 01:17pm
by Starglider
Slab is now complete and the formwork (blockwork) is going up for the lower walls.
The project is now using over 25 tonnes of steel (mostly rebar but some mesh and galvanised sheet) and over 300 tonnes of concrete.
My son is doing his best to assist.
It's impossible to use this tool without first shouting GIGHA DWWRILLLLLL BBBRRREEEAAAAAKKK-AH!
Or maybe that's just me.
Re: Stargate Command Croydon
Posted: 2017-08-26 03:41pm
by Eternal_Freedom
Damn, I saw the plans and read the numbers, but seeing the big damn hole you've dug makes it look a hell of a lot more impressive.
Also, cute kid.
Re: Stargate Command Croydon
Posted: 2017-09-25 09:42pm
by Sea Skimmer
This reminds me of why everyone but North Korea stopped building forts.
Re: Stargate Command Croydon
Posted: 2017-09-30 05:46am
by LaCroix
Sea Skimmer wrote: ↑2017-09-25 09:42pm
This reminds me of why everyone but North Korea stopped building forts.
Today, on "Destroyed in seconds"....
But seriously, that's quite an impressive project. A few minor modifications, and it might double as a nuclear fallout shelter, if not as a bunker...
Re: Stargate Command Croydon
Posted: 2017-10-07 10:22am
by Starglider
We are now pouring concrete for the lower walls:
I apologise for the disgusting dead organic material temporarily cluttering up the construction zone. One concrete is in place all of it will be stripped out, skipped, and probably recycled into toothpicks and/or American stick homes.
The only acceptable construction materials for a HAB facility are steel, concrete, tungsten (if depleted uranium not locally available), tungsten carbide, galvanised steel, waterproof concrete, copper (wiring & liners for the booby trap shaped charges), aluminium (ductwork and decorative propaganda pieces only), marble (Great Leader visit contingency area), stainless steel, high-strength concrete, titanium and PVC (exterior non-critical drainage only). Wood is a cONSPIRACY bY tHE 'tREES' tO iNFILTRATE oUR sPACES pACK tHEM wITH fUEL bURN uS aLL iN oUR sLEEP *ahem*
Formwork in high-stress areas e.g. door frames, corners, roof beams is formed of 8mm thick equal-angle structural sections which will be left in place to add strength to the structure. I've also doubled the cross sectional area of the rebar in the beams and some areas of the floor slab.
Re: Stargate Command Croydon
Posted: 2017-10-08 02:33pm
by Crossroads Inc.
Amazing stuff as always, have been following your adventures for some time, although haven't had much chance to comment.
Until now.
It's impossible to use this tool without first shouting GIGHA DWWRILLLLLL BBBRRREEEAAAAAKKK-AH!
Starglider, you must been of the worlds most Awesome Dads! Seriously you have such a lucky kid!
Re: Stargate Command Croydon
Posted: 2017-10-11 03:48am
by fordlltwm
Makes the mere 57tons of concrete I helped put down in the farm workshop over 4 days at the start of the year seem insignificant in comparison.
Amazing project
Re: Stargate Command Croydon
Posted: 2017-11-25 01:47pm
by Starglider
Getting concrete into the upper part of the lower walls required construction of the slab formwork first; the concrete pipeline is extremely heavy and even with five guys on site it's impractical to heft around. The intermediate slab weight will be approx 35 tonnes; the formwork is supported on about 70 Acrow props.
The galvanised steel sheet is working well; correctly braced, it's more rigid than plywood, weatherproof and cheaper. Also blocks mobile phone signals to reduce interruptions to the construction crew. The five main beams are 400mm x 300mm, 5 x 16mm rebar primary reinforcing, 12mm secondary reinforcing, with the lower section cased by four sections of 6mm steel angle for extra strength (and convenience when building them). Lots of of 2x8, 2x6 and 2x4 used in the temporary bracing.
Side drainage recently went in; there are seven 175mm drains on each side of the building: front threshold, roof downpipe, side path, and four air intake chambers. Earthing system also went in just before the concrete pour: 12 x 1.2m solid copper earth rods embeded at depths between 2 and 4 metres around the perimeter walls.
Looks like I'll have to buy the first bit of A/V gear early: my 10-year old Onkyo receiver just lost the ability to output HDMI. So now we can have sound or video in the living room but not both. I'm looking at the Denon AVR X6400, which is 11.2 for maximum speaker count silliness. It can go in the living room for now and move to the Test Chamber later. Alas, still no wired internet, keep hitting the transfer cap on the 4G and having to buy top-ups.
Re: Stargate Command Croydon
Posted: 2018-05-31 06:38pm
by Starglider
Slow progress on this build over the winter/spring but things have picked up recently.
Lower chamber after the walls were completed
Interim lighting solution
Wheelchair access under construction
Elite construction crew pondering their next move
Pouring the intermediate slab : 53 tonnes of waterproof concrete. The concrete I'm using has nearly six times the compressive strength of standard concrete blocks (tensile strength is provided by the rebar).
After this pour the biological material could be removed from the lower chamber; all of it went back into bracing up the ramp area.
The main door is 5m wide with 2.3m headroom
Fire escape hatch; the main risk is vehicles catching fire in the upper chamber, as there is no wood and minimal plastic used in the building.
The roof over part of the ramp forms a workbench, 3.4m wide x 1.2m deep x 0.9m worktop height (concrete to be poured tomorrow).
There is a greyhound-sized sink and area for washing machine and dryer built into the concrete structure. These minature concrete walls and slabs use galvanised weld-mesh for reinforcement.
The door into solid chalk is not only to confuse building inspectors, it will allow for an underground connection to the main house to be added later.
I told my wife that this apperture is for a future utility duct but it's actually the lower entrance to a Jefferies tube & escape tunnel.
Upgraded to a more useful work lighting solution.
I've gone with an Optoma laser projector, 2 x Quad ESL2912 electrostatic main speakers + 2 x Silberstatic electostatic centre speakers (vertically split phantom centre) + 4 x Magnepan MG7 surround speakers (ceiling speakers TBD). This rig was to test the phantom centre setup.
Re: Stargate Command Croydon
Posted: 2018-05-31 10:16pm
by Crossroads Inc.
bloody hell!
it really is coming together!
It is crazy to think this went from an insane fantasy to realty!
Re: Stargate Command Croydon
Posted: 2018-06-01 12:06pm
by Eternal_Freedom
Indeed. Very impressive!
Re: Stargate Command Croydon
Posted: 2018-06-04 07:30am
by LaCroix
The ultimate mancave...
"Man-man, to the Man-cave!"